Workflow
How site testing becomes the project record
From site testing to the final project record.
GridInFill follows one path: a project specification, the test recorded on site, the Office register, surveyed coordinates, and the surface comparison.
-
01
Set the testing specification
Define the test types, grid spacing, lift thickness, acceptance limits and construction layers for the project. Specifications can be included in a Field project package. Specifications.
-
02
Record the test in Field
Record the grid, construction layer, test type and result, including an original test and a retest. Field testing.
-
03
Review the Office register
Office lists the test code, measurement, pass, fail, pending or retest outcome, and the survey position. Testing register.
-
04
Review proposed RTK matches
Imported survey coordinates are proposed against the field records. The engineer reviews the evidence before a surveyed coordinate is applied. RTK matching.
-
05
Estimate testing demand
Estimate testing requirements across construction layers and grid areas from the project surfaces and testing rules. Testing forecast.
-
06
Compare the surfaces
Compare existing and proposed surfaces to calculate cut, fill and net earthworks volumes within the overlapping survey area. Cut and fill volumes.